Search Constraints
You searched for:
Series
Post-conservation
Remove constraint Series: Post-conservation
Topic
Church towers
Remove constraint Topic: Church towers
« Previous |
1 - 100 of 215 |
Next »
Search Results
3. Exterior works (AEF), Southeast corner of tower after installation of paving, steps, and handrail
10. Exterior works (AEF), View from east showing toilet on roof of tower and downpipe and new paving
58. Tower Ground Floor Interiors (After cons.), Storage jar displayed under stairs, ground floor passage
62. Tower Roof (After cons.), View of completed roof and stair enclosure from northeast at high level
97. Tower Ground Floor Interiors (After cons.), Tank in southwest room ground floor after treatment 2
- « Previous
- Next »
- 1
- 2
- 3