Search Constraints
Search Results
51. Interior Timber replacements, South lobe: replacement of damaged sections of timber at high level
60. Interior Timber replacements, Sanctuary south lobe lintel to southeast niche: visible surface damage
73. Interior Timber replacements, Niche on north side of sanctuary façade: damaged timber after removal
84. Interior Timber replacements, South lobe: detail of lintel after removal of damaged inner section
95. Interior Timber replacements, North lobe: treatment of new plaster infills with ‘dirty water’ toner
- « Previous
- Next »
- 1
- 2
- 3